Hatch was engaged to design a manufacturing execution system (MES) that includes functionality to manage the data exchange between SAP and the melt shop, one
rod mill and two bar mills with level 2 layer systems.
More about Manufacturing Execution System >
This project has been done for the ore transportation system from the ore processing plant to the metallurgical plant as a part of the QIT automation five-year modernization program. The project also included an process control system.
More about QIT Ore Transportation System >
The Ravensthorpe Nickel project is located 155 kms northwest of Esperance in Western Australia and includes the development of a mine, a hydrometallurgical process plant and associated infrastructure.
More about Ravensthorpe Nickel Project >
The Alouette Aluminum smelter was expanded from 245 000 tonnes per annum to 555 000 tonnes per annum. The Hatch Systems & Process Control team was tasked with providing efficient, integrated and scalable information and control systems
More about Aluminerie Alouette Phase 2 >